BESSの仕組み ― 電池セルの化学からバンカビリティまで。無料で学べます: learnBESS.com

Jinko ESS

Battery Cell DC Block AC Block

📍 Shanghai, China · Est. 2022Listed · NYSE: JKS

概要

Jinko ESS, established in 2022 as the energy storage division of JinkoSolar and headquartered in Shanghai, China, is a BNEF Tier 1 energy storage manufacturer offering utility-scale and commercial & industrial BESS. The company produces in-house 314Ah LFP cells through a joint venture with EVE Energy, with cumulative ESS shipments exceeding 3.3 GWh. Jinko ESS manufactures at facilities in Haining and Shangrao, China.

概要
US$9.4B
売上高
26,409
従業員数
3.3 GWh+
ESS出荷量
BBB
MSCI ESG格付

製品

Jinko ESS offers 6 BESS products across 3 categories: Battery Cell, DC Block, AC Block. 4 products have detailed specifications available.

Battery Cell illustration Battery Cell
314Ah LFP Cells
314 Ah
仕様を見る
588Ah LFP Cells
588 Ah
仕様を見る
DC Block illustration DC Block
SunTera G3
6,250 kWh
仕様を見る
SunTera G2
5,010 kWh
仕様を見る
AC Block illustration AC Block
SunGiga G2
261 kWh
仕様を見る
SunGiga G2 Plus
522 kWh
仕様を見る

グローバル拠点

Jinko ESS is headquartered in Shanghai, China with manufacturing in China (Haining, Shangrao). 6 known facilities worldwide.

HQ Manufacturing
施設・拠点
本社
Shanghai, China
製造拠点
Haining, Zhejiang, China (ESS)Shangrao, Jiangxi, ChinaQuang Ninh, VietnamJacksonville, Florida, USAPenang, Malaysia

財務データ・レポート

Jinko ESS is publicly listed (NYSE: JKS). Key figures from FY2025. Annual report available for download.

主要数値
US$9.4B
売上高
-US$635.6M
純利益
2.2%
粗利益率
US$128.3M
研究開発費
26,409
従業員数
3.3 GWh+
ESS出荷量
Source: FY2025 annual report
年次報告書2025 · PDF
株価パフォーマンス

サステナビリティ

Jinko ESS publishes an ESG report covering environmental, social, and governance practices. Rated BBB by MSCI ESG. Key metrics from 2024.

ESG主要数値
BBB
MSCI ESG格付
19.93 tCO2e/MW
GHG原単位
164,432 t
廃棄物リサイクル率
2,993
特許
1,981
研究開発人員
0
労働災害死亡者数
Source: 2024 ESG report
ESG報告書2024 · PDF

認証・コンプライアンス

Jinko ESS holds 3 certifications covering quality management, environmental standards, and safety compliance.

ISO 9001
ISO 14001
ISO 45001

導入実績・ケーススタディ

Selected BESS projects officially disclosed by Jinko ESS. 18 documented projects with case studies available for download.

100 MWh Grid-side Power Station — Jiande
Zhejiang, China 50 MW / 100 MWh Utility-scale
ダウンロード(PDF)
43 MWh C&I ESS Frame Contract
China 43 MWh C&I
ダウンロード(PDF)
20.64 MWh Utility-scale ESS — Jinan Fenghui
Fujian, China 20.64 MWh Utility-scale
ダウンロード(PDF)
20 MWh SunTera ESS — Baizhang Wind Farm
China 20 MWh Utility-scale
ダウンロード(PDF)
Datasheet
Jinko ESS · PDF
Download Datasheet
または
Get notified when Jinko ESS releases new products
仕様変更を自動で追跡します。