BESS कैसे काम करता है — सेल केमिस्ट्री से बैंकेबिलिटी तक। निःशुल्क शुरू करें learnBESS.com

Jinko ESS

Battery Cell DC Block AC Block

📍 Shanghai, China · Est. 2022Listed · NYSE: JKS

अवलोकन

Jinko ESS, established in 2022 as the energy storage division of JinkoSolar and headquartered in Shanghai, China, is a BNEF Tier 1 energy storage manufacturer offering utility-scale and commercial & industrial BESS. The company produces in-house 314Ah LFP cells through a joint venture with EVE Energy, with cumulative ESS shipments exceeding 3.3 GWh. Jinko ESS manufactures at facilities in Haining and Shangrao, China.

संक्षिप्त विवरण
US$9.4B
राजस्व
26,409
कर्मचारी
3.3 GWh+
ESS शिपमेंट
BBB
MSCI ESG रेटिंग

उत्पाद

Jinko ESS offers 6 BESS products across 3 categories: Battery Cell, DC Block, AC Block. 4 products have detailed specifications available.

Battery Cell illustration Battery Cell
314Ah LFP Cells
314 Ah
विनिर्देश देखें
588Ah LFP Cells
588 Ah
विनिर्देश देखें

वैश्विक उपस्थिति

Jinko ESS is headquartered in Shanghai, China with manufacturing in China (Haining, Shangrao). 6 known facilities worldwide.

HQ Manufacturing
सुविधाएँ
मुख्यालय
Shanghai, China
उत्पादन
Haining, Zhejiang, China (ESS)Shangrao, Jiangxi, ChinaQuang Ninh, VietnamJacksonville, Florida, USAPenang, Malaysia

वित्तीय डेटा और रिपोर्ट

Jinko ESS is publicly listed (NYSE: JKS). Key figures from FY2025. Annual report available for download.

प्रमुख आँकड़े
US$9.4B
राजस्व
-US$635.6M
शुद्ध आय
2.2%
सकल मार्जिन
US$128.3M
R&D खर्च
26,409
कर्मचारी
3.3 GWh+
ESS शिपमेंट
Source: FY2025 annual report
वार्षिक रिपोर्ट2025 · PDF
शेयर प्रदर्शन

स्थिरता

Jinko ESS publishes an ESG report covering environmental, social, and governance practices. Rated BBB by MSCI ESG. Key metrics from 2024.

प्रमुख ESG आँकड़े
BBB
MSCI ESG रेटिंग
19.93 tCO2e/MW
GHG तीव्रता
164,432 t
पुनर्चक्रित अपशिष्ट
2,993
पेटेंट
1,981
R&D कर्मचारी
0
कार्य-संबंधित मृत्यु
Source: 2024 ESG report
ESG रिपोर्ट2024 · PDF

प्रमाणन और अनुपालन

Jinko ESS holds 3 certifications covering quality management, environmental standards, and safety compliance.

ISO 9001
ISO 14001
ISO 45001

संदर्भ परियोजनाएँ और केस स्टडी

Selected BESS projects officially disclosed by Jinko ESS. 18 documented projects with case studies available for download.

100 MWh Grid-side Power Station — Jiande
Zhejiang, China 50 MW / 100 MWh Utility-scale
डाउनलोड करें (PDF)
43 MWh C&I ESS Frame Contract
China 43 MWh C&I
डाउनलोड करें (PDF)
20.64 MWh Utility-scale ESS — Jinan Fenghui
Fujian, China 20.64 MWh Utility-scale
डाउनलोड करें (PDF)
20 MWh SunTera ESS — Baizhang Wind Farm
China 20 MWh Utility-scale
डाउनलोड करें (PDF)
Datasheet
Jinko ESS · PDF
Download Datasheet
या
Get notified when Jinko ESS releases new products
हम विनिर्देश परिवर्तनों को ट्रैक करते हैं ताकि आपको न करना पड़े।