Magdisenyo ng BESS site layout sa loob ng ilang segundo — subukan nang LIBRE.

Sigenergy

PCS DC Block AC Block

📍 Shanghai, China · Est. 2022Listed · HKEX: 6656

2 research visits in the last 30 days↓

Pangkalahatang-tanaw

Sigenergy, founded in 2022 and headquartered in Shanghai, is a fast-growing energy storage company established by former Huawei Smart PV executives. The company builds AI-optimised residential and commercial storage systems around an integrated multi-function design, reaching customers in 85 countries through 172 distributors. Manufacturing runs from three sites in Shanghai and Nantong, and the company listed on the Main Board of the Hong Kong Stock Exchange in April 2026.


Mga Produkto

Sigenergy offers 3 BESS products across 3 categories: PCS, DC Block, AC Block.

PCS illustration PCS
C&I Hybrid Inverter
50 kW to 110 kW
Tingnan ang mga specification
DC Block illustration DC Block
SigenStack C&I
Tingnan ang mga specification
AC Block illustration AC Block
SigenStor 5-in-1
Tingnan ang mga specification

Global presence

Sigenergy is headquartered in Shanghai, China with manufacturing in China (Shanghai, Nantong). 4 known facilities worldwide.

HQ Manufacturing
Mga pasilidad
Head office
Shanghai, China
Manufacturing
Lingang, Shanghai, ChinaJinqiao, Shanghai, ChinaNantong, Jiangsu, China

Financial data at mga ulat

Sigenergy is publicly listed (HKEX: 6656).

Stock performance

Sustainability

Sigenergy publishes an ESG report covering environmental, social, and governance practices. Key metrics from 2025.

Mga pangunahing ESG datos
605/234
Mga patent
40%+ of workforce
R&D staff
0
Work-related na pagkamatay
15,000 MWh
Renewable Electricity
Source: 2025 ESG report (2nd report, HKEX ESG Reporting Guide basis). Scope 1 + 2 only; Scope 3 not reported. Total GHG: 10,534 tCO2e. 1,597 employees. Board: 37.5% female, 37.5% independent. Reporting period: Jan–Dec 2025.
ESG report2025 · PDF

Mga Certification at compliance

Sigenergy holds 4 certifications covering quality management, environmental standards, and safety compliance.

ISO 14001
ISO 45001
ISO 27001
ISO 9001

Mga reference project at case study

Selected BESS projects officially disclosed by Sigenergy.

Datasheet
Sigenergy · PDF
Download Datasheet
o
Get notified when Sigenergy releases new products
Sinusubaybayan namin ang mga pagbabago sa specification para hindi na po kayo ang magpagod.